首页 > 公司 > 合伙联营 > 合作合同英文版,合作合同的英文怎么说

合作合同英文版,合作合同的英文怎么说

来源:整理 时间:2023-01-12 16:30:40 编辑:律生活 手机版

1,合作合同的英文怎么说

Cooporative contractContract to cooporate
contract 合同agreement协议

合作合同的英文怎么说

2,合作合同的英文怎么说

Cooporative contractContract to cooporate

合作合同的英文怎么说

3,英文翻译产品外包代工代料合作协议书

Manufacturing Outsourcing Agreement
小译鼠翻译— 一样的价格 ,更好的质量;一样的质量,更低的价格。

英文翻译产品外包代工代料合作协议书

4,英文合作协议

Sales Agency Agreement 合同号: NO: 日期: Date: 为在平等互利的基础上发展贸易,有关方按下列条件签订本协议: This Agreement is entered into between the parties concerned on the basis of equality and mutual benefit to develop business on terms and conditions mutually agreed upon as follows: 1. 订约人 Contracting Parties 供货人(以下称甲方): 销售代理人(以下称乙方): 甲方委托乙方为销售代理人,推销下列商品。 Supplier: (hereinafter called "party A") Agent:(hereinafter called "party B") Party A hereby appoint Party B to act as his selling agent to sell the commodity mentioned below. 2. 商品名称及数量或金额 Commodity and Quantity or Amount 双方约定,乙方在协议有效期内, 销售不少于**的商品。 It is mutually agreed that Party B shall undertake to sell not less than... of the aforesaid commodity in the duration of this Agreement。 3. 经销地区 Territory 只限在.....。 In ... only. 4. 订单的确认 Confirmation of Orders 本协议所规定%C

5,友好会谈并签署双方友好合作协议 英文怎么说

After several friendly talks, the two sides signed the cooperative agreement
本协议自签署之日起生效this agreement shall come into effect from the date of signing

6,物流园建设合作协议书英文怎么说

物流园建设合作协议书Cooperation agreement for the construction of logistics parks物流园建设合作协议书Cooperation agreement for the construction of logistics parks
字多麻烦 还是去物流公司 那一份单子就好了 什么都有了

7,英文翻译中 制定合作协议的制定用哪个词啊 construct or establish

Establish cooperation agreement英文制定合作协议
你好!make不就行了嘛。make a cooperation agreement.希望对你有所帮助,望采纳。
formulate 或establish都可以
draw up cooperation agreement

8,ecfa指的是什么

ecfa指的是《海峡两岸经济合作框架协议》。英文为EconomicCooperationFrameworkAgreement。原称为《两岸综合性经济合作协定或称两岸综合经济合作协定》。《海峡两岸经济合作框架协议》简称:ECFA,是海峡两岸(中国台湾与中国大陆)之间的双边经济协议,于2010年6月由两岸两会领导人签订;2010年8月,中国台湾立法机构通过此协议。2010年1月26日,ECFA第一次两会专家工作商谈在北京举行。2010年6月29日,两岸两会领导人签订合作协议。2010年8月17日,台湾立法机构通过《海峡两岸经济合作框架协议》。实质上是两个经济体之间的自由贸易协定谈判的初步框架安排,同时又包含若干早期收获协议。协议旨在逐步减少或消除两岸的贸易和投资障碍,创造公平的贸易与投资环境,进一步增进双方的贸易与投资关系,建立有利于两岸经济共同繁荣与发展的合作机制。

9,这是公司的合同需要英文版以下大多不会谢谢了

Bidders reported by the equipment should include the price of equipment (including equipment suppliers random configuration of spare parts, special tools and instruments, meters) of the procurement, transportation, insurance, handling, warehousing, storage and after-sales service, such as ensuring that the warranty 2002 Equipment procurement and supply normal work of the full cost. 9.6 bidders reported by the main material prices should include materials procurement, transport, insurance, handling, storage and custody fees. 9.7 bidders reported by the installation of the system should include the cost of equipment installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs. 9.8 reported by the bidders for a device (not including imported equipment) should include the cost of installation of the equipment handling, warehousing, storage, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs . 9.9 reported by the bidders for a device (for imported equipment) should include the cost of installation of the equipment from storage materials from warehouses to the installation point of the transport, handling, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal All the work of the installation costs. 9.10 bidders reported by the installation of the costs should be included in the design and meet with other related systems interface (including an agreement opening up the software and hardware) and the civil engineering and co-ordination costs. If people think that the tender for the successful completion of the project there are other needs with a separate valuation of the work, they should set out the specific breakdown and amount. All of this project-related costs not included in line with a breakdown of the work, that were already included in other lines and the total amount of the tender. Compressed air systems procurement and installation of pipelines connecting. 4, all the indoor plumbing, the procurement and installation of pipelines, and except for drug pipeline. 5, the outdoor ditch / cable Gounei the procurement and installation of pipelines, including a drug pipeline system. Ditch the outdoor / cable ditch is concrete trench, build underground trench, buried trench, embedded in all of the structure for the laying of pipelines. 6, outdoor buried aqueduct from the civil engineering contractor to install, indoor and buried pipelines for the installation of boundary outdoor one metre, by the standard connector and the contractor for final closure Qiangdong. 7, all equipment (including the Party of the procurement and installation of equipment) of indoor and outdoor power cables procurement, installation, wiring, including the distribution counter to the scene from the junction boxes of the lighting system of power cables (35 KV power cables, automatic control / instrumentation systems The power cables and all the signal equipment, control cables, except for cable access control systems). Party B shall be responsible for providing compliance with the requirements of the preliminary design of a system maps, schematics and wiring diagram; provision of equipment installation size, weight and the necessary space for operation and maintenance of such information and take the initiative to do a good job with the design of the co-ordination, co-ordination and Liaison work, the design should be found in a timely manner to the design of the feedback, to amend the proposal. Party B shall not be responsible for providing the completion of civil works, equipment and the equipment to the scene to have warehousing, storage costs included in the tender lump sum B should be given the relevant state and city government agencies or other public service agencies request Party B in its own name to apply for various permits, approval and filing procedures, access to all relevant documents to prepare for the contract purposes. At the same time should also assist the Party and all relevant departments and agencies to maintain communication and liaison to ensure that the project can be successful in the relevant departments in accordance with the law of the network and (or) permitted acceptance Before the completion of the project acceptance, Party A Party B shall provide the full set of drawings as well as equipment for completion of the relevant drawings, manuals and technical documents. The technical drawings, technical documents and information should be detailed description of the performance of equipment and their components, principles, structure, size and parts and components of the models, specifications and technical parameters最好找个专业的外教老师进行详细指导,听说奥威斯发展大厦29层不错。
Bidders reported by the equipment should include the price of equipment (including equipment suppliers random configuration of spare parts, special tools and instruments, meters) of the procurement, transportation, insurance, handling, warehousing, storage and after-sales service, such as ensuring that the warranty 2002 Equipment procurement and supply normal work of the full cost. 9.6 bidders reported by the main material prices should include materials procurement, transport, insurance, handling, storage and custody fees. 9.7 bidders reported by the installation of the system should include the cost of equipment installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs. 9.8 reported by the bidders for a device (not including imported equipment) should include the cost of installation of the equipment handling, warehousing, storage, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs . 9.9 reported by the bidders for a device (for imported equipment) should include the cost of installation of the equipment from storage materials from warehouses to the installation point of the transport, handling, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal All the work of the installation costs. 9.10 bidders reported by the installation of the costs should be included in the design and meet with other related systems interface (including an agreement opening up the software and hardware) and the civil engineering and co-ordination costs. If people think that the tender for the successful completion of the project there are other needs with a separate valuation of the work, they should set out the specific breakdown and amount. All of this project-related costs not included in line with a breakdown of the work, that were already included in other lines and the total amount of the tender. Compressed air systems procurement and installation of pipelines connecting. 4, all the indoor plumbing, the procurement and installation of pipelines, and except for drug pipeline. 5, the outdoor ditch / cable Gounei the procurement and installation of pipelines, including a drug pipeline system. Ditch the outdoor / cable ditch is concrete trench, build underground trench, buried trench, embedded in all of the structure for the laying of pipelines. 6, outdoor buried aqueduct from the civil engineering contractor to install, indoor and buried pipelines for the installation of boundary outdoor one metre, by the standard connector and the contractor for final closure Qiangdong. 7, all equipment (including the Party of the procurement and installation of equipment) of indoor and outdoor power cables procurement, installation, wiring, including the distribution counter to the scene from the junction boxes of the lighting system of power cables (35 KV power cables, automatic control / instrumentation systems The power cables and all the signal equipment, control cables, except for cable access control systems). Party B shall be responsible for providing compliance with the requirements of the preliminary design of a system maps, schematics and wiring diagram; provision of equipment installation size, weight and the necessary space for operation and maintenance of such information and take the initiative to do a good job with the design of the co-ordination, co-ordination and Liaison work, the design should be found in a timely manner to the design of the feedback, to amend the proposal. Party B shall not be responsible for providing the completion of civil works, equipment and the equipment to the scene to have warehousing, storage costs included in the tender lump sum B should be given the relevant state and city government agencies or other public service agencies request Party B in its own name to apply for various permits, approval and filing procedures, access to all relevant documents to prepare for the contract purposes. At the same time should also assist the Party and all relevant departments and agencies to maintain communication and liaison to ensure that the project can be successful in the relevant departments in accordance with the law of the network and (or) permitted acceptance Before the completion of the project acceptance, Party A Party B shall provide the full set of drawings as well as equipment for completion of the relevant drawings, manuals and technical documents. The technical drawings, technical documents and information should be detailed description of the performance of equipment and their components, principles, structure, size and parts and components of the models, specifications and technical parameters详细学习请到奥威斯发展大厦29层进行学习。
我覺得呢。你直接在百度搜中英文翻譯會更快些。。
文章TAG:合作合同英文版合作合作合同合同

最近更新

  • 不超过,篇幅不超过300字个字数不超过300字有什么区别不超过,篇幅不超过300字个字数不超过300字有什么区别

    篇幅不超过300字个字数不超过300字有什么区别2,不超过27岁是包括27岁还是不包括27岁3,文件最大不超过200M是什么意思4,请问坐飞机行李不能超过多少公斤5,新劳动合同每周工作不超过多少小时.....

    合伙联营 日期:2024-02-08

  • 口爆什么意思,嘿咻是什么意思口爆什么意思,嘿咻是什么意思

    嘿咻是什么意思2,羞射是什么意思3,口吹是什么意思4,口交是什么意思5,潮喷是什么意思6,口嗨是什么意思1,嘿咻是什么意思语助词,没什么意思,相当于劳动人民做事时喊的号子,有控制节奏的作用.2,.....

    合伙联营 日期:2024-02-08

  • 欧阳琴,欧阳琴的韩语怎么写欧阳琴,欧阳琴的韩语怎么写

    欧阳琴的韩语怎么写2,关于陆小凤之决战前后3,求代号十三钗里十三个金钗的所有名字4,代号十三钗的十三位主角是5,代号十三钗剧中女演员名单6,长相甜美上过央视春晚演过主旋律影视剧的女明星1.....

    合伙联营 日期:2024-02-08

  • 希腊签证中心官网,希腊签证中心网站用哪个浏览器能打开希腊签证中心官网,希腊签证中心网站用哪个浏览器能打开

    希腊签证中心网站用哪个浏览器能打开你好;你用QQ浏览器就可以打开的,QQ浏览器的安装包很小,占不了多大的内存,功能却很强大,它采用单核模式,有很小的安装包,和超强的稳定型。浏览网页的速度也.....

    合伙联营 日期:2024-02-08

  • 公车上书,简述公车上书公车上书,简述公车上书

    简述公车上书2,简述公车上书的历史意义但也不要太短3,及求公车上书之上书的内容原文4,公车上书怎么读5,哪里能看到公车上书原文6,历史上的公车上书中的公车是什么意思1,简述公车上书1985年,以.....

    合伙联营 日期:2024-02-08

  • 三违,在安全生产工作中通常所说的三违现象是指什么三违,在安全生产工作中通常所说的三违现象是指什么

    在安全生产工作中通常所说的三违现象是指什么2,什么是三违3,三违是什么4,三违指的有哪些5,三违是指什么6,三违是指什么7,什么是三违8,什么是三违1,在安全生产工作中通常所说的三违现象是指什么.....

    合伙联营 日期:2024-02-08

  • 重庆公积金贷款利率,重庆首套房公积金贷款利率是多少重庆公积金贷款利率,重庆首套房公积金贷款利率是多少

    重庆首套房公积金贷款利率是多少2,重庆住房公积金贷款利率一般是多少3,重庆市住房公积金贷款利息是多少钱4,重庆住房公积金房贷最新利率是多少1,重庆首套房公积金贷款利率是多少现行公积金.....

    合伙联营 日期:2024-02-08

  • 天津小客车调控,天津摇车牌号怎么报名天津小客车调控,天津摇车牌号怎么报名

    天津摇车牌号怎么报名2,天津市怎样申请汽车摇号3,天津小客车摇号怎么摇4,天津市汽车限购限行的具体措施是嘛5,天津小车摇号怎么摇6,小车怎么摇号1,天津摇车牌号怎么报名天津市小客车调控管理.....

    合伙联营 日期:2024-02-08