首页 > 公司 > 经济仲裁 > 英文版的合作协议模板,进口贸易代理协议范本英文翻译急需 谢谢

英文版的合作协议模板,进口贸易代理协议范本英文翻译急需 谢谢

来源:整理 时间:2023-03-15 09:08:40 编辑:律生活 手机版

本文目录一览

1,进口贸易代理协议范本英文翻译急需 谢谢

进出口代理商只能为国内企业做代理,所以代理协议是与国内企业签订的,不需要英文版本。与外商所签的只能是进口(或出口)合同(SALES CONTRACT)。

进口贸易代理协议范本英文翻译急需 谢谢

2,请教前辈们英文格式的合作意向书怎么写

你说呢...
请参阅http://info.china.alibaba.com/news/detail/v3-d5558282.htmlhttp://info.china.alibaba.com/news/detail/v3-d5558282.htmlhttp://www.24en.com/ESP/law/2006-01-04/2265.html

请教前辈们英文格式的合作意向书怎么写

3,这是公司的合同需要英文版以下大多不会谢谢了

Bidders reported by the equipment should include the price of equipment (including equipment suppliers random configuration of spare parts, special tools and instruments, meters) of the procurement, transportation, insurance, handling, warehousing, storage and after-sales service, such as ensuring that the warranty 2002 Equipment procurement and supply normal work of the full cost. 9.6 bidders reported by the main material prices should include materials procurement, transport, insurance, handling, storage and custody fees. 9.7 bidders reported by the installation of the system should include the cost of equipment installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs. 9.8 reported by the bidders for a device (not including imported equipment) should include the cost of installation of the equipment handling, warehousing, storage, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs . 9.9 reported by the bidders for a device (for imported equipment) should include the cost of installation of the equipment from storage materials from warehouses to the installation point of the transport, handling, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal All the work of the installation costs. 9.10 bidders reported by the installation of the costs should be included in the design and meet with other related systems interface (including an agreement opening up the software and hardware) and the civil engineering and co-ordination costs. If people think that the tender for the successful completion of the project there are other needs with a separate valuation of the work, they should set out the specific breakdown and amount. All of this project-related costs not included in line with a breakdown of the work, that were already included in other lines and the total amount of the tender. Compressed air systems procurement and installation of pipelines connecting. 4, all the indoor plumbing, the procurement and installation of pipelines, and except for drug pipeline. 5, the outdoor ditch / cable Gounei the procurement and installation of pipelines, including a drug pipeline system. Ditch the outdoor / cable ditch is concrete trench, build underground trench, buried trench, embedded in all of the structure for the laying of pipelines. 6, outdoor buried aqueduct from the civil engineering contractor to install, indoor and buried pipelines for the installation of boundary outdoor one metre, by the standard connector and the contractor for final closure Qiangdong. 7, all equipment (including the Party of the procurement and installation of equipment) of indoor and outdoor power cables procurement, installation, wiring, including the distribution counter to the scene from the junction boxes of the lighting system of power cables (35 KV power cables, automatic control / instrumentation systems The power cables and all the signal equipment, control cables, except for cable access control systems). Party B shall be responsible for providing compliance with the requirements of the preliminary design of a system maps, schematics and wiring diagram; provision of equipment installation size, weight and the necessary space for operation and maintenance of such information and take the initiative to do a good job with the design of the co-ordination, co-ordination and Liaison work, the design should be found in a timely manner to the design of the feedback, to amend the proposal. Party B shall not be responsible for providing the completion of civil works, equipment and the equipment to the scene to have warehousing, storage costs included in the tender lump sum B should be given the relevant state and city government agencies or other public service agencies request Party B in its own name to apply for various permits, approval and filing procedures, access to all relevant documents to prepare for the contract purposes. At the same time should also assist the Party and all relevant departments and agencies to maintain communication and liaison to ensure that the project can be successful in the relevant departments in accordance with the law of the network and (or) permitted acceptance Before the completion of the project acceptance, Party A Party B shall provide the full set of drawings as well as equipment for completion of the relevant drawings, manuals and technical documents. The technical drawings, technical documents and information should be detailed description of the performance of equipment and their components, principles, structure, size and parts and components of the models, specifications and technical parameters详细学习请到奥威斯发展大厦29层进行学习。
我覺得呢。你直接在百度搜中英文翻譯會更快些。。
Bidders reported by the equipment should include the price of equipment (including equipment suppliers random configuration of spare parts, special tools and instruments, meters) of the procurement, transportation, insurance, handling, warehousing, storage and after-sales service, such as ensuring that the warranty 2002 Equipment procurement and supply normal work of the full cost. 9.6 bidders reported by the main material prices should include materials procurement, transport, insurance, handling, storage and custody fees. 9.7 bidders reported by the installation of the system should include the cost of equipment installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs. 9.8 reported by the bidders for a device (not including imported equipment) should include the cost of installation of the equipment handling, warehousing, storage, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal work of the installation of all project costs . 9.9 reported by the bidders for a device (for imported equipment) should include the cost of installation of the equipment from storage materials from warehouses to the installation point of the transport, handling, installation, commissioning, training, opened to traffic, acceptance, support and insurance system to ensure normal All the work of the installation costs. 9.10 bidders reported by the installation of the costs should be included in the design and meet with other related systems interface (including an agreement opening up the software and hardware) and the civil engineering and co-ordination costs. If people think that the tender for the successful completion of the project there are other needs with a separate valuation of the work, they should set out the specific breakdown and amount. All of this project-related costs not included in line with a breakdown of the work, that were already included in other lines and the total amount of the tender. Compressed air systems procurement and installation of pipelines connecting. 4, all the indoor plumbing, the procurement and installation of pipelines, and except for drug pipeline. 5, the outdoor ditch / cable Gounei the procurement and installation of pipelines, including a drug pipeline system. Ditch the outdoor / cable ditch is concrete trench, build underground trench, buried trench, embedded in all of the structure for the laying of pipelines. 6, outdoor buried aqueduct from the civil engineering contractor to install, indoor and buried pipelines for the installation of boundary outdoor one metre, by the standard connector and the contractor for final closure Qiangdong. 7, all equipment (including the Party of the procurement and installation of equipment) of indoor and outdoor power cables procurement, installation, wiring, including the distribution counter to the scene from the junction boxes of the lighting system of power cables (35 KV power cables, automatic control / instrumentation systems The power cables and all the signal equipment, control cables, except for cable access control systems). Party B shall be responsible for providing compliance with the requirements of the preliminary design of a system maps, schematics and wiring diagram; provision of equipment installation size, weight and the necessary space for operation and maintenance of such information and take the initiative to do a good job with the design of the co-ordination, co-ordination and Liaison work, the design should be found in a timely manner to the design of the feedback, to amend the proposal. Party B shall not be responsible for providing the completion of civil works, equipment and the equipment to the scene to have warehousing, storage costs included in the tender lump sum B should be given the relevant state and city government agencies or other public service agencies request Party B in its own name to apply for various permits, approval and filing procedures, access to all relevant documents to prepare for the contract purposes. At the same time should also assist the Party and all relevant departments and agencies to maintain communication and liaison to ensure that the project can be successful in the relevant departments in accordance with the law of the network and (or) permitted acceptance Before the completion of the project acceptance, Party A Party B shall provide the full set of drawings as well as equipment for completion of the relevant drawings, manuals and technical documents. The technical drawings, technical documents and information should be detailed description of the performance of equipment and their components, principles, structure, size and parts and components of the models, specifications and technical parameters最好找个专业的外教老师进行详细指导,听说奥威斯发展大厦29层不错。

这是公司的合同需要英文版以下大多不会谢谢了

文章TAG:英文版的合作协议模板英文英文版合作

最近更新

  • 丘陵和山地的区别,山地与丘陵有什么区别丘陵和山地的区别,山地与丘陵有什么区别

    山地与丘陵有什么区别2,请问山地跟丘陵的区别何在呢3,山地与丘陵的区别4,山和丘陵的区别是什么5,高中地理丘陵与山地的区别6,丘陵跟山地的区别是什么1,山地与丘陵有什么区别高出海平面500米.....

    经济仲裁 日期:2024-02-08

  • 捷信公司电话,广东捷信担保有限公司的客服热线是多少捷信公司电话,广东捷信担保有限公司的客服热线是多少

    广东捷信担保有限公司的客服热线是多少2,捷信公司总部电话是什么3,深圳外贸信托捷信有限公司的客服电话是多少呢4,捷信公司的咨询号码5,捷信客服电话是多少6,请问捷信客服是多少1,广东捷信担.....

    经济仲裁 日期:2024-02-08

  • 宿迁市是哪里,宿迁是哪个省的宿迁市是哪里,宿迁是哪个省的

    宿迁是哪个省的2,宿迁在哪里3,宿迁市是那个省4,宿迁在哪省5,宿迁在哪里6,宿迁市在哪里1,宿迁是哪个省的目前宿迁市属于江苏省位于江苏省北部希望对你有帮助2,宿迁在哪里宿迁,位于江苏省淮安市.....

    经济仲裁 日期:2024-02-08

  • 地铁站几点关门,广州地铁营业时间是几点到几点地铁站几点关门,广州地铁营业时间是几点到几点

    广州地铁营业时间是几点到几点2,请问地铁站什么时候关门下班3,地铁晚上几点关门4,昆明地铁几点末班5,地铁几点关门6,昆明地铁几点开几点关1,广州地铁营业时间是几点到几点一般是早上6点到晚.....

    经济仲裁 日期:2024-02-08

  • 外贸公司实习报告,求外贸公司的实习周记20篇左右外贸公司实习报告,求外贸公司的实习周记20篇左右

    求外贸公司的实习周记20篇左右2,贸易公司的实习报告3,求一篇暑期外贸实习报告4,进出口实习报告5,外贸公司实习报告怎么写公司的现状及问题6,我是外语专业03级学生跪求一篇在外贸公司的实习.....

    经济仲裁 日期:2024-02-08

  • 西安黑舞厅,西安现还有黑舞厅之类的娱乐场所吗西安黑舞厅,西安现还有黑舞厅之类的娱乐场所吗

    西安现还有黑舞厅之类的娱乐场所吗2,西安红袖黑舞厅3,西安还有黑舞厅吗4,谁知道西安经二路附近那有黑舞厅5,西安火车站周围有没有黑舞厅6,西安哪的黑舞厅好点特别是东郊1,西安现还有黑舞厅之.....

    经济仲裁 日期:2024-02-08

  • 郑州开户,在郑州怎么开户需多少钱郑州开户,在郑州怎么开户需多少钱

    在郑州怎么开户需多少钱2,在郑州做股票怎么开户3,在郑州哪里可以开股票账户啊多少钱4,在郑州中原证券开户怎么办理1,在郑州怎么开户需多少钱上一个回答不好,个人开户把沪深两市的户都开了也.....

    经济仲裁 日期:2024-02-08

  • 车险种,车险有几大险种车险种,车险有几大险种

    车险有几大险种2,车辆基本保险有哪些3,车辆保险有些什么险种4,车辆保险买哪几种最好5,汽车各保险各保什么6,汽车保险有哪些种类1,车险有几大险种8大险种!2,车辆基本保险有哪些国家强制:交强险,车.....

    经济仲裁 日期:2024-02-08